Athens Building Corp. is awarded the contract for the improvements to Tonsler Park. The scope of work will be consistent with plans and include the proper staking of the proposed stairs; clearing and site work within the construction location; forming and pouring of a full set of concrete stairs with handrails and a short section of walkway to provide a connection to an existing walkway. This is a steep site with a significant change in elevation from 5th Street to the walking path. The project also includes modification to an existing VDOT installed guard rail on 5th Street.
3/16/2017 Progress is moving forward now that the weather has settled.
6/30/17 – Project Completed. Project Manager, Steven Jones with another successful project.